Caporn Piling
Project Director
Value $60m

M12RT Black Hill to Tomago Bypass John Holland Section. M12RT Black Hill to Tomago Bypass Seymour Whyte Heatherbrae section. Hexham Stright Widening Alliance Project, Heatherbrae.
Piled foundations across 3 sites adhering to TNSW Steel Tube Pile and Bored Pile Specifications. Heavy Lift Cranes, multiple crews.
DT Infrastructure (DTI)
Project Support
Value $25m

LOCATION
QR Belyando Bridges Replacement Project.
Piled foundations, staged bridge demolition inc rail and ballast removal, installation of precast bridge headstocks and deck units under shutdown conditions. Installation of new track.
Baseline Projects
Subcontractor
HMAS Moreton
$0.5m

Bulimba, QLD
Hardstand repairs, concrete slabs and asphalt pavements. Detailed earthworks, drainage modifications, subsoil drains, road pavements and civil preparations for new Admin Building.
Whittens Group
Senior Project Manager
Value $10m

Mine Access Road Bridges Crossings Project.
Construction of 5 x creek crossings comprising of 3 bridges and 2 large reinforced concrete base/precast culvert crossings. Detailed earthworks, significant ESC in waterway environment. Heavy Lift cranes, piled foundations, FRP structural concrete elements.
Value $30m

St Mary’s and Quakers Hill Sewer Treatment Plant Upgrades.
Detailed excavation, piling, large reinforced concrete structures, DICL and stainless steel pipework. Large Periform formwork, high risk environment, working at heights and confined spaces.
Value $20m

Carmichael Mine Coal Handling Preparation Plan.
Bulk earthworks, detailed earthworks, piling, ground improvement, complex steel reinforced concrete foundations, trestle and large structure foundation and slabs.
Value $8m

Carmichael Mine Belt Press Foundations and NPI Upgrades.
Detailed Excavation in Brownfields environment delivering complex reinforced concrete foundations using traditional stick formwork (RMD Super slim soldiers and LVL/ply faced forms)
Value $15m


Roy Hill Heavy Vehicle Workshop Slab.
Bulk earthworks, large scale reinforced steel concrete slab construction up to 600mm thick plus embedded steel rails. Included earthing and buried pipework for lube lines and installation of cast in situ heavy vehicle inspection pit.